Pink Floyd – Week 22
Welcome to week 22 🙂 We made a lot of fabrication and re-assembly progress over the last week. We installed the new dual brake master system and finished shimming the body. Still working on the clutch rod, it is not lined up quite right.
We then finished most of the interior insulation (a product called Second Skin) but we ran out and had to order more.
We then completed the installation of a more modern windshield wiper system which required a bit of fabrication.
The Vintage Air A/C system was by far the most non-standard installation thus far in the project. It seems at each step of the process there are small tweaks here and there but over all it has had good instructions and it is almost completely installed.
[nggallery id=61]